Remodeling invoice template

Remodeling Invoice Template

Everything a general contractor should put on an invoice — the line items you actually bill for, a worked example with real numbers, and the three mistakes that cost general contractors the most money. Then send it in about a minute.

Free plan: 5 documents/month · No credit card · Works from your phone

Start here

What an remodeling invoice is for

An invoice is not a quote with the word changed. It is a payment demand, and it needs the things that actually get you paid: a due date, accepted payment methods, a reference back to the approved quote, and late terms you are prepared to enforce.

For general contractors selling to homeowners planning renovations, the invoice is usually the only thing the customer compares side by side against two competitors. It is doing sales work whether you designed it to or not.

The unit that trips this trade up: Remodels live or die on allowances — every finish the customer has not picked yet needs a number attached to it.

Non-negotiables

What every remodeling invoice must have

Line items

What general contractors bill for

These are the lines that show up on most remodeling invoices, with the unit each is normally priced in. Ranges are illustrative planning figures, not market data — your own costs, region, and margin decide the real number.

Line itemUnitTypical range
Design and permit drawingseach$1,500–$12,000
Demolition and haul-awayeach$1,200–$8,000
Framing and structuralsq ft$25–$95
Cabinetry allowanceeach$6,000–$35,000
Countertop allowancesq ft$45–$180
Tile and flooring allowancesq ft$6–$32
Plumbing and electrical rough-ineach$3,500–$18,000
Project management and supervision%$10–$20

Typical deposit convention: Deposit at contract with milestone draws through the project.

Worked example

Remodeling invoice example

A realistic job, priced line by line, with the arithmetic shown the way a customer sees it:

Kitchen remodel, 180 sq ft, mid-range finishes INV-0042 · Example invoice
DescriptionQtyUnit priceLine total
Design, drawings and permits1$3,800.00$3,800.00
Demolition and disposal1$2,650.00$2,650.00
Cabinetry allowance — semi-custom1$14,500.00$14,500.00
Countertop allowance — 42 sq ft quartz42$88.00$3,696.00
Plumbing and electrical rough-in and trim1$7,400.00$7,400.00
Tile, paint and finish carpentry1$6,200.00$6,200.00
Project management — 15%1$5,300.00$5,300.00
Subtotal$43,546.00
Tax (7.75%)$3,374.82
Total$46,920.82

Notice that every assumption is a line rather than a conversation. That is the whole difference between an invoice that holds up and one that gets renegotiated in a driveway.

What goes wrong

Three mistakes that cost general contractors money

Allowances with no number

'Customer to select tile' with no dollar figure means the customer selects the tile they like and you eat the difference. Every allowance needs a per-unit number and a statement that overages are change orders.

No change-order process on the document

Remodels always change. State the process — written, priced, approved before work proceeds — on the original quote, so the first change is a procedure instead of a confrontation.

Treating the schedule as a promise

Inspections, backordered cabinets, and customer decisions all move the date. Name the dependencies rather than committing to a completion date you do not control.

Sending it

How to send an remodeling invoice in about a minute

A template is only half the job — the invoice still has to reach the customer in a form they can act on. With SendQuoteNow you add the customer, add your line items, and hit send. Your customer gets a branded PDF plus a link where they approve or decline with one click, and you get an email the moment they do.

See exactly how it works →

Questions

Remodeling invoice FAQ

Design and permit costs; demolition; each trade's scope; a dollar figure attached to every allowance; project management as its own line; the change-order process; the payment schedule tied to milestones; and what is explicitly excluded.
As a per-unit dollar amount with the quantity — '42 sq ft countertop allowance at $88/sq ft' — plus a sentence that selections above the allowance are billed as a change order. Vague allowances are the single largest source of remodeling disputes.
Tie payments to milestones rather than dates: deposit at contract, then draws at demolition complete, rough-in inspection passed, and substantial completion, with a retainage at punch list. Milestone-based schedules survive delays that date-based ones do not.
Yes. Create a free SendQuoteNow account and send up to 5 documents a month — invoices, invoices and purchase orders all count toward the same 5 — with no credit card. Unlimited is $4.99 a month.

Send your first remodeling invoice today

Free plan, no credit card, nothing to install. Build it on your phone and send it before you pull out of the driveway.