Concrete invoice template

Concrete Invoice Template

Everything a concrete contractor should put on an invoice — the line items you actually bill for, a worked example with real numbers, and the three mistakes that cost concrete contractors the most money. Then send it in about a minute.

Free plan: 5 documents/month · No credit card · Works from your phone

Start here

What an concrete invoice is for

An invoice is not a quote with the word changed. It is a payment demand, and it needs the things that actually get you paid: a due date, accepted payment methods, a reference back to the approved quote, and late terms you are prepared to enforce.

For concrete contractors selling to homeowners, builders, and commercial sites, the invoice is usually the only thing the customer compares side by side against two competitors. It is doing sales work whether you designed it to or not.

The unit that trips this trade up: Concrete is priced per square foot for flatwork and per cubic yard for material — and access for the truck changes everything.

Non-negotiables

What every concrete invoice must have

Line items

What concrete contractors bill for

These are the lines that show up on most concrete invoices, with the unit each is normally priced in. Ranges are illustrative planning figures, not market data — your own costs, region, and margin decide the real number.

Line itemUnitTypical range
Driveway or patio flatworksq ft$8–$18
Stamped or decorative concretesq ft$14–$32
Demolition and removal of existingsq ft$3–$10
Base prep, grading and compactionsq ft$2–$7
Rebar and wire reinforcementsq ft$1–$3
Concrete materialcu yd$165–$320
Pump truck (limited access)each$600–$2,200
Sealer and finishsq ft$0–$3

Typical deposit convention: Deposit at scheduling, balance on pour completion.

Worked example

Concrete invoice example

A realistic job, priced line by line, with the arithmetic shown the way a customer sees it:

620 sq ft driveway replacement INV-0042 · Example invoice
DescriptionQtyUnit priceLine total
Demolition and haul-away of existing slab620$4.25$2,635.00
Base prep, grade and compact620$2.85$1,767.00
Rebar grid and expansion joints620$1.45$899.00
Concrete placement and broom finish — 4,000 psi620$7.50$4,650.00
Sealer application620$0.85$527.00
Subtotal$10,478.00
Tax (7.75%)$812.04
Total$11,290.05

Notice that every assumption is a line rather than a conversation. That is the whole difference between an invoice that holds up and one that gets renegotiated in a driveway.

What goes wrong

Three mistakes that cost concrete contractors money

Assuming truck access

If the mixer cannot reach the pour, you need a pump and the price changes by four figures. State the access assumption on the quote.

No cure-time expectations

Customers drive on new concrete. Put the cure period and the consequences in writing, because a tire mark on day two becomes your warranty claim otherwise.

Not naming control joints and cracking

Concrete cracks. Explain control joints on the document and state plainly that hairline cracking is normal and not a defect. This one paragraph prevents most concrete callbacks.

Sending it

How to send an concrete invoice in about a minute

A template is only half the job — the invoice still has to reach the customer in a form they can act on. With SendQuoteNow you add the customer, add your line items, and hit send. Your customer gets a branded PDF plus a link where they approve or decline with one click, and you get an email the moment they do.

See exactly how it works →

Questions

Concrete invoice FAQ

Square footage and slab thickness; psi rating; demolition and disposal; base prep and compaction; reinforcement; finish type; control joint layout; sealer; cure time before use; truck access assumptions; and a plain statement about normal hairline cracking.
Quote assuming direct chute access and state that assumption explicitly, with a named price for a pump truck if access proves inadequate. Never absorb a pump you did not price.
Yes. Stating that hairline cracks are a normal property of concrete and not a workmanship defect, before the customer signs, is the difference between an educated client and a warranty dispute.
Yes. Create a free SendQuoteNow account and send up to 5 documents a month — invoices, invoices and purchase orders all count toward the same 5 — with no credit card. Unlimited is $4.99 a month.

Send your first concrete invoice today

Free plan, no credit card, nothing to install. Build it on your phone and send it before you pull out of the driveway.

Start Free — 5 Documents a Month